Maximum guaranteed efficiency for your SPA project

bbspa_Engineering aims to achieve maximum managerial efficiency in the architectural and plant design of your SPA. The service guarantees the development of cutting-edge management and technological solutions, paying particular attention on sustainability. Optimization of customer/operator paths, efficiency, safety, costs and optimized times: these are the benefits of our SPA engineering process, to be carried out in synergy with your team of architects, for projects developed to perfection and maximum profitability.

NEW SPA
SOS SPA

NEW SPA

PHASE 1: PHASE 2: PHASE 3: PHASE 4: PHASE 5: PHASE 6:
Engineering architectural layout Engineering layout and technologies for the DRY SPA area Engineering layout and technologies for the WET SPA area Engineering of air treatment systems Engineering of water treatment systems Engineering of energy management systems

PHASE 1:

Engineering architectural layout

Starting point, the definition of the architectural layout of the project: it represents the basis we will work on, the land to cultivate its services and treatments based on the available spaces and their rational organization, oriented to the achievement of maximum efficiency and quality of SPA services for Customers and Operators.

PHASE 2:

Engineering layout and technologies for the DRY SPA area

The design of “dry” spaces is an operation often overlooked because of the apparent low degree of difficulty it is associated with. A well-established Dry Area, on the other hand, is strategic for a high-level service as it involves a large part of the environments that involve both the customers and the team and the management of the SPA: from the changing rooms to the treatment cabins, spaces should be imagined and designed in such a way as to guarantee functionality and quality.

PHASE 3:

Engineering layout and technologies for the WET SPA area

The Wet Area, on the other hand, is the most complex set of spaces to deal with, due to the high level of articulation of the plants involved and the indispensable specifications for its optimal use by users and operators. For this reason it is necessary to design and implement solutions studied in every detail, that take into account every variable involved and do not neglect anything, for a result that combines efficiency and value.

PHASE 4:

Engineering of air treatment systems

The design of the air treatment systems of the various SPA areas takes on great importance for the quality perceived by the customers and for the protection of the materials and technologies present in spaces designed to guarantee the wellbeing of the person during the entire duration of the stay and the profitability of the investment.

PHASE 5:

Engineering of water treatment systems

Water, the most characteristic and emblematic element of the SPA, presents a high level of complexity of management, treatment and control, due to the several forms in which it is present in the SPA. A careful design of the areas and technologies that concern water, it is a priority for the quality of services and for a limited and rationalized expense.

PHASE 6:

Engineering of energy management systems

The optimization of the energy we use in the SPA has a positive impact not only on the environment, but also on the structure’s income statement: modern systems, which use the latest technologies and which are designed in such a way as to combine minimum consumption and maximum efficiency, are a main element for the success of the activity.

SOS SPA

PHASE 1: PHASE 2: PHASE 3: PHASE 4:
Analysis & Site visit Diagnosis and layout optimization plan and all technologies for dry area Diagnosis and layout optimization plan and all technologies for wet area Diagnosis and optimization plan for air, water and energy management systems

PHASE 1:

Analysis & site visit

With our team we will proceed with identifying the strengths and weaknesses of the structure through the analysis of public spaces, services and flows related to them, the evaluation of the technologies present in both the Dry and Wet areas and the total energy consumption. The goal is to collect all the useful elements to arrive at an accurate diagnosis of the reality of your SPA.

PHASE 2:

Diagnosis and layout optimization plan and all the technologies of the DRY Area

The goal is to make this area as performing as possible therefore, after the diagnosis that we will issue and the dialogue with you that will follow, we will propose an intervention plan to arrive at a Dry Area set in an optimal way in order to guarantee you a service of high level with the highest possible profitability.

PHASE 3:

Diagnosis and layout optimization plan and all the technologies of the WET Area

Since these are the most complex environments of the SPA for Layout and technologies, after the diagnosis that we will issue and the dialogue with you that will follow, we will propose an intervention plan to make the WET Area one of your strengths that is such as to guarantee you a service of high level with a careful management of spaces and costs to reach its maximum possible profitability.

PHASE 4:

Diagnosis and optimization plan for air, water treatment and energy management systems

With our network of specialists in the management and optimization of systems and energy in the SPA area, after the diagnosis that we will issue and the dialogue with you that will follow, we will propose an intervention plan aimed at guaranteeing the well-being of the person they attend and work in your SPA, and achieve the optimization of the profitability of your investment.